Here is a copy of the Saginaw County Public Notice on the Babcock Drain.
The applicant proposes: Excavate 838.6 feet in length of temporary wetlands to create a new section of Babcock drain that is currently acting as a drainage ditch, install two culverts in permanent wetland of 6 feet in length by 4.301 feet in width and 40 feet in length by 4.3 feet in width. Also excavate 10.5 linear feet in length of the Babcock drain. This is to control flooding.
Questions/Concerns should be directed to Brian Wendling:
Public Works Commissioner
111 S. Michigan Ave.
Saginaw, MI 48602
Phone: (989) 790-5258
email:dpw@saginawcounty.com